Artículos relacionados a Performance-Based Earned Value: 64 (Practitioners)

Performance-Based Earned Value: 64 (Practitioners) - Tapa blanda

 
9780471721888: Performance-Based Earned Value: 64 (Practitioners)

Sinopsis

A complete toolkit for implementation of Earned Value Management

Performance-Based Earned Value uniquely shows project managers how to effectively integrate technical, schedule, and cost objectives by improving earned value management (EVM) practices. Providing innovative guidelines, methods, examples, and templates consistent with capability models and standards, this book approaches EVM from a practical level with understandable techniques that are applicable to the management of any project.

Clear and unambiguous instructions explain how to incorporate EVM with key systems engineering, software engineering, and project management processes such as establishing the technical or quality baseline, requirements management, using product metrics, and meeting success criteria for technical reviews. Detailed information is included on linking product requirements, project work products, the project plan, and the Performance Measurement Baseline (PMB), as well as correlating technical performance measures (TPM) with EVM. With straightforward instructions on how to use EVM on a simple project, such as building a house, and on complex projects, such as high-risk IT and engineering development projects, it is the only book that includes excerpts from the PMI®'s Project Management Body of Knowledge (PMBOK®), CMMI, the EVM System standard, systems engineering standards, federal acquisition regulations, and Department of Defense guides.

Performance-Based Earned Value allows both novices and experienced project managers, including project manager of suppliers and customers in the commercial and government sectors; software and systems engineering process improvement leaders; CMMI appraisers; PMI members; and IEEE Computer Society members to:

  • Incorporate product requirements and planned quality into the PMB
  • Conduct an Integrated Baseline Review
  • Analyze performance reports
  • Perform independent assessments and predictive analysis
  • Ensure that key TPMs are selected, monitored, and reported
  • Identify the right success criteria for technical reviews
  • Develop techniques for monitoring and controlling supplier performance
  • Integrate risk management with EVM
  • Comply with government acquisition policies and regulations

Written by Paul Solomon and Ralph Young, internationally recognized industry experts, Performance-Based Earned Value is constructed from guidance in standards and capability models for EVM, systems engineering, software engineering, and project management. It is the complete guide to EVM, invaluable in helping students prepare for the PMI®-PMP® exam with practical examples and templates to facilitate understanding, and in guiding project professionals in the private and public sectors to use EVM on complex projects.

(PMI, PMBOK, PMP, and Project Management Professional are registered marks of the Project Management Institute, Inc.)

"Sinopsis" puede pertenecer a otra edición de este libro.

Acerca del autor

PAUL J. SOLOMON, PMP, is an internationally known consultant and author on Earned Value Management (EVM), and founder of his firm, Performance-Based Earned Value®. Mr. Solomon led the use of EVM on programs at Northrop Grumman Corporation, including the B-2 Stealth Bomber and the F-35 Joint Strike Fighter. He is a coauthor of EVM standards, including the national standard, ANSI/EIA-748 (for which he received the U.S. Department of Defense David Packard Excellence in Acquisition Award) and the PMI Practice Standard for EVM. He was a visiting scientist at the Software Engineering Institute (SEI) and wrote an SEI report on CMMI® and EVM. Mr. Solomon frequently speaks at industry and government conferences and is a tutor concerning EVM, systems engineering, and software engineering in the U.S. and India.

RALPH R. YOUNG, DBA, is Director of Engineering Process Improvement, Systems and Process Engineering, Defense Group at Northrop Grumman Information Technology. Dr. Young helped lead his former business unit (Litton PRC) to CMM Level 5 and his current business unit to CMMI® Level 5. Northrop Grumman Corporation's Defense Group was the first organization in the world to be evaluated a second time at CMMI® Level 5. Dr. Young supports continuous improvement for both internal and external projects, to make process improvements, implement effective requirements practices, and develop innovations to facilitate project management.

De la contraportada

A complete toolkit for implementation of Earned Value Management

Performance-Based Earned Value® uniquely shows project managers how to effectively integrate technical, schedule, and cost objectives by improving earned value management (EVM) practices. Providing innovative guidelines, methods, examples, and templates consistent with capability models and standards, this book approaches EVM from a practical level with understandable techniques that are applicable to the management of any project.

Clear and unambiguous instructions explain how to incorporate EVM with key systems engineering, software engineering, and project management processes such as establishing the technical or quality baseline, requirements management, using product metrics, and meeting success criteria for technical reviews. Detailed information is included on linking product requirements, project work products, the project plan, and the Performance Measurement Baseline (PMB), as well as correlating technical performance measures (TPM) with EVM. With straightforward instructions on how to use EVM on a simple project, such as building a house, and on complex projects, such as high-risk IT and engineering development projects, it is the only book that includes excerpts from the PMI's Project Management Body of Knowledge (PMBOK® ), CMMI® , the EVM System standard, systems engineering standards, federal acquisition regulations, and Department of Defense guides.

Performance-Based Earned Value® allows both novices and experienced project managers?including project managers of suppliers and customers in the commercial and government sectors; software and systems engineering process improvement leaders; CMMI® appraisers; PMI members; and IEEE Computer Society members?to:

  • Incorporate product requirements and planned quality into the PMB
  • Conduct an Integrated Baseline Review
  • Analyze performance reports
  • Perform independent assessments and predictive analysis
  • Ensure that key TPMs are selected, monitored, and reported
  • Identify the right success criteria for technical reviews
  • Develop techniques for monitoring and controlling supplier performance
  • Integrate risk management with EVM
  • Comply with government acquisition policies and regulations

Written by Paul Solomon and Ralph Young, internationally recognized industry experts, Performance-Based Earned Value® is constructed from guidance in standards and capability models for EVM, systems engineering, software engineering, and project management. It is the complete guide to EVM, invaluable in helping students prepare for the PMI-PMP® exam with practical examples and templates to facilitate understanding, and in guiding project professionals in the private and public sectors to use EVM on complex projects.

"Sobre este título" puede pertenecer a otra edición de este libro.

Comprar usado

Condición: Aceptable
Used book that is in clean, average...
Ver este artículo

GRATIS gastos de envío en Estados Unidos de America

Destinos, gastos y plazos de envío

Comprar nuevo

Ver este artículo

EUR 2,27 gastos de envío en Estados Unidos de America

Destinos, gastos y plazos de envío

Otras ediciones populares con el mismo título

9780470084663: Performance-Based Earned Value

Edición Destacada

ISBN 10:  0470084669 ISBN 13:  9780470084663
Tapa dura

Resultados de la búsqueda para Performance-Based Earned Value: 64 (Practitioners)

Imagen de archivo

Solomon, Paul, Young, Ralph
Publicado por Wiley & Sons, Incorporated, John, 2006
ISBN 10: 0471721883 ISBN 13: 9780471721888
Antiguo o usado Tapa blanda

Librería: Better World Books: West, Reno, NV, Estados Unidos de America

Calificación del vendedor: 5 de 5 estrellas Valoración 5 estrellas, Más información sobre las valoraciones de los vendedores

Condición: Good. Used book that is in clean, average condition without any missing pages. Nº de ref. del artículo: 52105691-75

Contactar al vendedor

Comprar usado

EUR 13,05
Convertir moneda
Gastos de envío: GRATIS
A Estados Unidos de America
Destinos, gastos y plazos de envío

Cantidad disponible: 1 disponibles

Añadir al carrito

Imagen de archivo

Solomon, Paul; Young, Ralph
Publicado por Wiley-IEEE Computer Society PR, 2006
ISBN 10: 0471721883 ISBN 13: 9780471721888
Antiguo o usado Paperback

Librería: ThriftBooks-Atlanta, AUSTELL, GA, Estados Unidos de America

Calificación del vendedor: 5 de 5 estrellas Valoración 5 estrellas, Más información sobre las valoraciones de los vendedores

Paperback. Condición: Very Good. No Jacket. May have limited writing in cover pages. Pages are unmarked. ~ ThriftBooks: Read More, Spend Less 1.25. Nº de ref. del artículo: G0471721883I4N00

Contactar al vendedor

Comprar usado

EUR 13,06
Convertir moneda
Gastos de envío: GRATIS
A Estados Unidos de America
Destinos, gastos y plazos de envío

Cantidad disponible: 1 disponibles

Añadir al carrito

Imagen de archivo

-
Publicado por -, 2006
ISBN 10: 0471721883 ISBN 13: 9780471721888
Antiguo o usado Paperback

Librería: AwesomeBooks, Wallingford, Reino Unido

Calificación del vendedor: 5 de 5 estrellas Valoración 5 estrellas, Más información sobre las valoraciones de los vendedores

Paperback. Condición: Very Good. Performance-Based Earned Value: 64 (Practitioners) This book is in very good condition and will be shipped within 24 hours of ordering. The cover may have some limited signs of wear but the pages are clean, intact and the spine remains undamaged. This book has clearly been well maintained and looked after thus far. Money back guarantee if you are not satisfied. See all our books here, order more than 1 book and get discounted shipping. Nº de ref. del artículo: 7719-9780471721888

Contactar al vendedor

Comprar usado

EUR 25,91
Convertir moneda
Gastos de envío: EUR 5,74
De Reino Unido a Estados Unidos de America
Destinos, gastos y plazos de envío

Cantidad disponible: 1 disponibles

Añadir al carrito

Imagen de archivo

-
Publicado por - -, 2006
ISBN 10: 0471721883 ISBN 13: 9780471721888
Antiguo o usado Paperback

Librería: Bahamut Media, Reading, Reino Unido

Calificación del vendedor: 5 de 5 estrellas Valoración 5 estrellas, Más información sobre las valoraciones de los vendedores

Paperback. Condición: Very Good. This book is in very good condition and will be shipped within 24 hours of ordering. The cover may have some limited signs of wear but the pages are clean, intact and the spine remains undamaged. This book has clearly been well maintained and looked after thus far. Money back guarantee if you are not satisfied. See all our books here, order more than 1 book and get discounted shipping. Nº de ref. del artículo: 6545-9780471721888

Contactar al vendedor

Comprar usado

EUR 25,91
Convertir moneda
Gastos de envío: EUR 8,03
De Reino Unido a Estados Unidos de America
Destinos, gastos y plazos de envío

Cantidad disponible: 1 disponibles

Añadir al carrito

Imagen del vendedor

Solomon, Paul J.; Young, Ralph R.
Publicado por Wiley-IEEE Computer Society Pr, 2006
ISBN 10: 0471721883 ISBN 13: 9780471721888
Nuevo Tapa blanda

Librería: GreatBookPrices, Columbia, MD, Estados Unidos de America

Calificación del vendedor: 5 de 5 estrellas Valoración 5 estrellas, Más información sobre las valoraciones de los vendedores

Condición: New. Nº de ref. del artículo: 3187885-n

Contactar al vendedor

Comprar nuevo

EUR 76,83
Convertir moneda
Gastos de envío: EUR 2,27
A Estados Unidos de America
Destinos, gastos y plazos de envío

Cantidad disponible: 1 disponibles

Añadir al carrito

Imagen de archivo

Paul Solomon
Publicado por John Wiley and Sons, 2006
ISBN 10: 0471721883 ISBN 13: 9780471721888
Nuevo Tapa blanda

Librería: INDOO, Avenel, NJ, Estados Unidos de America

Calificación del vendedor: 5 de 5 estrellas Valoración 5 estrellas, Más información sobre las valoraciones de los vendedores

Condición: New. Nº de ref. del artículo: 9780471721888

Contactar al vendedor

Comprar nuevo

EUR 79,18
Convertir moneda
Gastos de envío: GRATIS
A Estados Unidos de America
Destinos, gastos y plazos de envío

Cantidad disponible: Más de 20 disponibles

Añadir al carrito

Imagen del vendedor

Solomon, Paul J.; Young, Ralph R.
Publicado por Wiley-IEEE Computer Society Pr, 2006
ISBN 10: 0471721883 ISBN 13: 9780471721888
Antiguo o usado Tapa blanda

Librería: GreatBookPrices, Columbia, MD, Estados Unidos de America

Calificación del vendedor: 5 de 5 estrellas Valoración 5 estrellas, Más información sobre las valoraciones de los vendedores

Condición: As New. Unread book in perfect condition. Nº de ref. del artículo: 3187885

Contactar al vendedor

Comprar usado

EUR 87,07
Convertir moneda
Gastos de envío: EUR 2,27
A Estados Unidos de America
Destinos, gastos y plazos de envío

Cantidad disponible: 1 disponibles

Añadir al carrito

Imagen del vendedor

Paul Solomon (Autor), Ralph Young (Autor):
Publicado por Wiley-IEEE Computer Society Pr, 2007
ISBN 10: 0471721883 ISBN 13: 9780471721888
Antiguo o usado Paperback

Librería: Buchladen an der Kyll, Birgel, Alemania

Calificación del vendedor: 5 de 5 estrellas Valoración 5 estrellas, Más información sobre las valoraciones de los vendedores

Paperback. Condición: Sehr gut. Leichte Druckstelle auf der Covervorderseite, kleine Lagerspuren am Buch, Inhalt einwandfrei und ungelesen 233065 Sprache: Englisch Gewicht in Gramm: 570. Nº de ref. del artículo: 384924

Contactar al vendedor

Comprar usado

EUR 36,99
Convertir moneda
Gastos de envío: EUR 60,00
De Alemania a Estados Unidos de America
Destinos, gastos y plazos de envío

Cantidad disponible: 1 disponibles

Añadir al carrito

Imagen del vendedor

Paul Solomon
Publicado por John Wiley & Sons Inc, New York, 2007
ISBN 10: 0471721883 ISBN 13: 9780471721888
Nuevo Paperback Original o primera edición

Librería: Grand Eagle Retail, Bensenville, IL, Estados Unidos de America

Calificación del vendedor: 5 de 5 estrellas Valoración 5 estrellas, Más información sobre las valoraciones de los vendedores

Paperback. Condición: new. Paperback. A complete toolkit for implementation of Earned Value Management Performance-Based Earned Value uniquely shows project managers how to effectively integrate technical, schedule, and cost objectives by improving earned value management (EVM) practices. Providing innovative guidelines, methods, examples, and templates consistent with capability models and standards, this book approaches EVM from a practical level with understandable techniques that are applicable to the management of any project. Clear and unambiguous instructions explain how to incorporate EVM with key systems engineering, software engineering, and project management processes such as establishing the technical or quality baseline, requirements management, using product metrics, and meeting success criteria for technical reviews. Detailed information is included on linking product requirements, project work products, the project plan, and the Performance Measurement Baseline (PMB), as well as correlating technical performance measures (TPM) with EVM. With straightforward instructions on how to use EVM on a simple project, such as building a house, and on complex projects, such as high-risk IT and engineering development projects, it is the only book that includes excerpts from the PMI's Project Management Body of Knowledge (PMBOK), CMMI, the EVM System standard, systems engineering standards, federal acquisition regulations, and Department of Defense guides. Performance-Based Earned Value allows both novices and experienced project managers, including project manager of suppliers and customers in the commercial and government sectors; software and systems engineering process improvement leaders; CMMI appraisers; PMI members; and IEEE Computer Society members to: Incorporate product requirements and planned quality into the PMBConduct an Integrated Baseline ReviewAnalyze performance reportsPerform independent assessments and predictive analysisEnsure that key TPMs are selected, monitored, and reportedIdentify the right success criteria for technical reviewsDevelop techniques for monitoring and controlling supplier performanceIntegrate risk management with EVMComply with government acquisition policies and regulations Written by Paul Solomon and Ralph Young, internationally recognized industry experts, Performance-Based Earned Value is constructed from guidance in standards and capability models for EVM, systems engineering, software engineering, and project management. It is the complete guide to EVM, invaluable in helping students prepare for the PMI-PMP exam with practical examples and templates to facilitate understanding, and in guiding project professionals in the private and public sectors to use EVM on complex projects. (PMI, PMBOK, PMP, and Project Management Professional are registered marks of the Project Management Institute, Inc.) A complete toolkit for implementation of Earned Value Management Performance-Based Earned Value uniquely shows project managers how to effectively integrate technical, schedule, and cost objectives by improving earned value management (EVM) practices. Shipping may be from multiple locations in the US or from the UK, depending on stock availability. Nº de ref. del artículo: 9780471721888

Contactar al vendedor

Comprar nuevo

EUR 99,73
Convertir moneda
Gastos de envío: GRATIS
A Estados Unidos de America
Destinos, gastos y plazos de envío

Cantidad disponible: 1 disponibles

Añadir al carrito

Imagen de archivo

Paul Solomon
Publicado por Wiley-IEEE Computer Society Pr, 2006
ISBN 10: 0471721883 ISBN 13: 9780471721888
Nuevo Paperback

Librería: Toscana Books, AUSTIN, TX, Estados Unidos de America

Calificación del vendedor: 5 de 5 estrellas Valoración 5 estrellas, Más información sobre las valoraciones de los vendedores

Paperback. Condición: new. Excellent Condition.Excels in customer satisfaction, prompt replies, and quality checks. Nº de ref. del artículo: Scanned0471721883

Contactar al vendedor

Comprar nuevo

EUR 102,57
Convertir moneda
Gastos de envío: EUR 3,70
A Estados Unidos de America
Destinos, gastos y plazos de envío

Cantidad disponible: 1 disponibles

Añadir al carrito

Existen otras 12 copia(s) de este libro

Ver todos los resultados de su búsqueda