Book by Antill James M Woodhead Ronald W
"Sinopsis" puede pertenecer a otra edición de este libro.
EUR 29,85 gastos de envío desde Estados Unidos de America a España
Destinos, gastos y plazos de envíoLibrería: Bingo Books 2, Vancouver, WA, Estados Unidos de America
Hardcover. Condición: Very Good. 2nd Edition. second edition hardback book in very good condition,name at top of first blank page. Nº de ref. del artículo: 121576
Cantidad disponible: 1 disponibles
Librería: Mr Pickwick's Fine Old Books, Katoomba, NSW, Australia
Hardcover (Original Cloth). Condición: Very Good. Estado de la sobrecubierta: No Dust Jacket. Second Edition. One of a collection of 150 specialist Trade books, including carpentry, wood turning, wooden boat building,stonemasonry, blacksmithing, tile making and the like. All are available for sale at this site. Use the special keyword pickwicktrade to compile an on-screen list of all these still available. Size: Octavo (standard book size). 414 pages. Text body is clean, and free from previous owner annotation, underlining and highlighting. Binding is tight, covers and spine fully intact. No foxing in this copy. Edges browned slightly. Quantity Available: 1. Shipped Weight: Under 1 kilogram. Category: Engineering, Industrial, Trade; ISBN: 0471032468. ISBN/EAN: 9780471032465. All our pictures shown here are of the actual item, not stock photos. Inventory No: 32060: Main Trade For further info on this title, click on the "Contact Seller" button within this listing. We will try to reply within 24 hours. Otherwise you can order right now (inclusive of shipping options) from the "Add to Basket" button to the right. Nº de ref. del artículo: 32060
Cantidad disponible: 1 disponibles
Librería: Bingo Used Books, Vancouver, WA, Estados Unidos de America
Hardcover. Condición: Very Good. Estado de la sobrecubierta: Very Good. 2nd Edition. hardback in very good+ condition with very good- dust jacket. 2nd edition. Nº de ref. del artículo: 118018
Cantidad disponible: 1 disponibles
Librería: Bank of Books, Ventura, CA, Estados Unidos de America
paperback. Condición: Good. Ex-Library book. No dust jacket. Book has black covers with red and gold titles. Book shows common (average) signs of wear and use. Binding is still tight. Covers are intact but may be repaired. We have 75,000 books to choose from -- Ship within 24 hours -- Satisfaction Guaranteed! Nº de ref. del artículo: mon0000937086
Cantidad disponible: 1 disponibles
Librería: BookDepart, Shepherdstown, WV, Estados Unidos de America
Hardcover. Condición: UsedGood. Hardcover, second edition; surplus library copy with the usual stampings; reference number taped to spine; fading and edge wear to exterior; otherwise in good condition with clean text, firm binding. Nº de ref. del artículo: 53737
Cantidad disponible: 1 disponibles
Librería: clickgoodwillbooks, Indianapolis, IN, Estados Unidos de America
Condición: acceptable. Used - Acceptable: All pages and the cover are intact, but shrink wrap, dust covers, or boxed set case may be missing. Pages may include limited notes, highlighting, or minor water damage but the text is readable. Item may be missing bundled media. Nº de ref. del artículo: 3O6ZVA0000JZ_ns
Cantidad disponible: 1 disponibles
Librería: HPB-Red, Dallas, TX, Estados Unidos de America
paperback. Condición: Acceptable. Connecting readers with great books since 1972. Used textbooks may not include companion materials such as access codes, etc. May have condition issues including wear and notes/highlighting. We ship orders daily and Customer Service is our top priority! Nº de ref. del artículo: S_441286446
Cantidad disponible: 1 disponibles