Idioma: Inglés
Publicado por Pitman, 1964
Librería: A Squared Books (Don Dewhirst), South Lyon, MI, Estados Unidos de America
EUR 7,57
Cantidad disponible: 1 disponibles
Añadir al carritoHardcover. Condición: Very Good. Estado de la sobrecubierta: Very Good. Black cloth covered boards with silver spine titles; jacket has mild edge wear, with a few small chips and tears along edges; 8vo - over 7 3/4" to 9 3/4" tall; interior clean and unmarked; 111 pages.
EUR 9,25
Cantidad disponible: 1 disponibles
Añadir al carritoHardback. Condición: Very Good. The book has been read, but is in excellent condition. Pages are intact and not marred by notes or highlighting. The spine remains undamaged.
EUR 9,25
Cantidad disponible: 1 disponibles
Añadir al carritoHardback. Condición: Good. The book has been read but remains in clean condition. All pages are intact and the cover is intact. Some minor wear to the spine.
Idioma: Inglés
Publicado por Pitman
Librería: Anybook.com, Lincoln, Reino Unido
EUR 2,96
Cantidad disponible: 1 disponibles
Añadir al carritoHardcover. Condición: Fair. Dust Jacket Included. This book has hardback covers. Ex-library, With usual stamps and markings, In fair condition, suitable as a study copy. Dust Jacket in fair condition. Please note the Image in this listing is a stock photo and may not match the covers of the actual item,400grams, ISBN:
EUR 7,04
Cantidad disponible: 1 disponibles
Añadir al carritoHardback. Condición: Used: Acceptable. Hardback with D/J in good condition. Ex library with first page removed. 3rd edition Pitman 1969. - used books, secondhand books, out of print books, hard to find books, for sale, second-hand books, college books, student books, nonfiction, first edition, signed copies, non-fiction books delivered world wide. Excess postage may be required for books over 1 kg in weight outside the EU. ISBN 0-273-40544-6 0273405446.
EUR 4,65
Cantidad disponible: 1 disponibles
Añadir al carritoCondición: Fair. This is an ex-library book and may have the usual library/used-book markings inside.This book has soft covers. In fair condition, suitable as a study copy. Please note the Image in this listing is a stock photo and may not match the covers of the actual item,400grams, ISBN:0273011774.
EUR 5,39
Cantidad disponible: 1 disponibles
Añadir al carritoCondición: Poor. This is an ex-library book and may have the usual library/used-book markings inside.This book has soft covers. In poor condition, suitable as a reading copy. Please note the Image in this listing is a stock photo and may not match the covers of the actual item,400grams, ISBN:0273011774.
Publicado por Sir Isaac Pitman & Sons, Ltd., 1964
Librería: World of Rare Books, Goring-by-Sea, SXW, Reino Unido
Original o primera edición
EUR 7,10
Cantidad disponible: 1 disponibles
Añadir al carritoCondición: Good. 1964. First Edition. 111 pages. Illustrated dust jacket over dark red cloth. Pages and binding are presentable with no major defects. Minor issues present such as mild cracking, inscriptions, inserts, light foxing, tanning and thumb marking. Overall a good condition item. Boards have mild shelf wear with light rubbing and corner bumping. Some light marking and sunning. Unclipped jacket has light edge wear with minor tears and chipping. Mild rubbing and marking.
Idioma: Inglés
Publicado por Sir Isaac Pitman & Sons, 1969
ISBN 10: 0273405446 ISBN 13: 9780273405443
Librería: Anybook.com, Lincoln, Reino Unido
EUR 8,63
Cantidad disponible: 1 disponibles
Añadir al carritoCondición: Good. This is an ex-library book and may have the usual library/used-book markings inside.This book has hardback covers. In good all round condition. Dust jacket in fair condition. Please note the Image in this listing is a stock photo and may not match the covers of the actual item,450grams, ISBN:0273405446.
Publicado por Sir Isaac Pitman and Sons Ltd, 1964
Librería: BoundlessBookstore, Wallingford, Reino Unido
EUR 2,37
Cantidad disponible: 1 disponibles
Añadir al carritoCondición: Good. DJ may have small chips and tears. Book will have been read but remains clean. Cover may have light wear or slight soiling. Pages may be slightly tanned. May contain inscriptions.
Librería: BOOKBARROW (PBFA member), Cambridge, Reino Unido
Miembro de asociación: PBFA
EUR 7,10
Cantidad disponible: 1 disponibles
Añadir al carritoBlack Cloth. Condición: Near Fine. Estado de la sobrecubierta: Near Fine. Reprint. illustrated by b/w. diagrams & charts; "this third edition of the pioneer work on Critical Path Analysis is suitable for both student and practitioner. It contains the distillation of wide experience in teaching and using C. P. A. and embraces all the useful manipulations and calculations currently being used. No mathematical expertise is implied or required. Critical Path Analysis (CPA) is a project management tool that sets out all the individual activities that make up a larger project & shows the order in which activities have to be undertaken including which activities can only take place once other activities have been completed & which activities can be undertaken simultaneously, thereby reducing the overall time taken to complete the whole project."; including index - 219 pages. Size: 8vo - over 7¾" - 9¾" tall. Quantity Available: 1. Category: Science & Technology; C. P. A.; Project Planning; Engineering, Industrial, Trade. ISBN: 0273405446. ISBN/EAN: 9780273405443. Inventory No: SCE00042.
Publicado por PITMAN
Librería: Kennys Bookstore, Olney, MD, Estados Unidos de America
EUR 8,36
Cantidad disponible: 1 disponibles
Añadir al carritoCondición: As New. 1964. Reprint. Hardcover. Clean copy. . . . . Books ship from the US and Ireland.
Publicado por Pitman Publishing, 1965
Librería: World of Rare Books, Goring-by-Sea, SXW, Reino Unido
EUR 11,83
Cantidad disponible: 1 disponibles
Añadir al carritoCondición: Good. 1965. 111 pages. No dust jacket. Black cloth. Pages are lightly tanned and thumbed at the edges, with light foxing. Binding has remained firm. Boards are a little rub worn, slight shelf wear to corners, spine and edges. Corners are a little bumped. Spine ends are mildly crushed. Light tanning to spine and edges. Boards are bowed. Book has a forward lean.
Publicado por PITMAN, 1964
Librería: Kennys Bookshop and Art Galleries Ltd., Galway, GY, Irlanda
EUR 8,55
Cantidad disponible: 1 disponibles
Añadir al carritoCondición: As New. 1964. Reprint. Hardcover. Clean copy. . . . .
Publicado por Sir Isaac Pitman & Sons, 1965
Librería: Anybook.com, Lincoln, Reino Unido
EUR 4,55
Cantidad disponible: 1 disponibles
Añadir al carritoCondición: Good. This is an ex-library book and may have the usual library/used-book markings inside.This book has hardback covers. Clean from markings. In good all round condition. No dust jacket. Please note the Image in this listing is a stock photo and may not match the covers of the actual item,350grams, ISBN:
Publicado por London: Pitman, 1969
Librería: Plurabelle Books Ltd, Cambridge, Reino Unido
Miembro de asociación: GIAQ
EUR 14,20
Cantidad disponible: 1 disponibles
Añadir al carritoHardcover. Condición: Very Good. 219p hardback with purple jacket, nice clean copy Language: English.
Idioma: Inglés
Publicado por Sir Isaac Pitman & Sons Ltd, London, 1969
ISBN 10: 0273405446 ISBN 13: 9780273405443
Librería: J J Basset Books, bassettbooks, bookfarm.co.uk, Peter Tavy, Reino Unido
EUR 14,20
Cantidad disponible: 1 disponibles
Añadir al carritoBlack Cloth. Condición: Very Good. No Jacket. Diagrams Ilustrador. Third Edition. Please Email for further details. Size: 8vo - over 7¾" - 9¾". Signed By a "J.A Sherman".
Publicado por Pitman
Librería: Watermill Books, Ammanford, Reino Unido
EUR 11,82
Cantidad disponible: 1 disponibles
Añadir al carritoHardback. Condición: Good. Hardback. With dust jacket. Photograph available on request.
Idioma: Inglés
Publicado por Pitman, London, 1969
Librería: Marion Pitman Books, Reading, Reino Unido
EUR 17,75
Cantidad disponible: 1 disponibles
Añadir al carritoHardcover. Condición: Very Good. Estado de la sobrecubierta: Good. Third Edition. D/w bit worn & frayed on edges, sm. tear in back.
Publicado por Pitman, London, 1969
Librería: Laura Books, Georgetown, SA, Australia
EUR 14,12
Cantidad disponible: 1 disponibles
Añadir al carritoHard Cover. Condición: Very Good. Estado de la sobrecubierta: Good. 3rd Edition. owners name front endpaper, otherwise book clean and tight. DJ: some wear Size: 8vo - over 7¾" - 9¾" tall.
Idioma: Inglés
Publicado por PITMAN, 1964
Librería: NEPO UG, Rüsselsheim am Main, Alemania
EUR 14,18
Cantidad disponible: 1 disponibles
Añadir al carritoGebundene Ausgabe. Condición: Gut. 111 Seiten Versand sofort weltweit. Rechnung mit ausgewiesener MwSt. Bibliotheksexemplar. Worldwide shipping with invoice. Ex library Sprache: Englisch Gewicht in Gramm: 550.
Publicado por Pitman, 1967
Librería: BookDepart, Shepherdstown, WV, Estados Unidos de America
EUR 30,44
Cantidad disponible: 1 disponibles
Añadir al carritoHardcover. Condición: UsedGood. Hardcover, 2nd edition; surplus library copy with the usual stampings; reference number taped to dust jacket spine; light shelf wear, light fading to exterior; a few coffee-colored marks at bottom outside page edge; otherwise in good condition with clean text, firm binding. Dust jacket, light fading, light shelf wear; wrapped in protective Mylar sleeve.
Publicado por Sir Isaac Pitman And Sons Ltd
Librería: Watermill Books, Ammanford, Reino Unido
EUR 30,04
Cantidad disponible: 1 disponibles
Añadir al carritohardcover. Condición: Good. Hardback. With dust jacket. Photograph available on request.
Publicado por Sir Isaac Pitman & Sons Ltd, London, 1967
Librería: Pulp Fiction Murwillumbah, Murwillumbah, NSW, Australia
EUR 30,70
Cantidad disponible: 1 disponibles
Añadir al carritoHardcover. Condición: Very Good. Estado de la sobrecubierta: Fair. 2nd. Dust jacket is chipped and clipped, there is some foxing to the endpapers, and a small inscription.
Publicado por Pitman Publishing, New York, 1967
Librería: Rare Book Cellar, Pomona, NY, Estados Unidos de America
EUR 42,79
Cantidad disponible: 1 disponibles
Añadir al carritoHardcover. Second Edition. Near Fine in a Very Good+ dust jacket.